Wittus SHAKER Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Cuisiniers Wittus SHAKER. Wittus SHAKER User manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 25
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
SHAKER Stove
Installation and User Manual
Imported by:
PO Box 120 Pound Ridge NY 10576
T.914-764-5679 F.914-764-0465
info@ Wittus.com www.wittus.com
Tested and
Listed by:
OMNI-Test Laboratories, Inc.
Report #: 339-S-01-02
C US
Portland
Oregon USA
Read this manual carefully and save the instructions.
Revised 10/13/11
Vue de la page 0
1 2 3 4 5 6 ... 24 25

Résumé du contenu

Page 1 - SHAKER Stove

SHAKER Stove Installation and User Manual Imported by: PO Box 120 Pound Ridge NY 10576 T.914-764-5679 F.914-764-0465 info@ Wittu

Page 2 - Installation and User Manual

10 Each chimney connector or chimney connector section must be installed to the stove flue collar and to each other with the male (crimped) end towar

Page 3 - Introduction and Purpose

11 For rear venting or other not listed configurations, consult the local building codes and follow the NFPA 211 or CAN/CSA-B365 guidelines. To insta

Page 4 - Technical Data

12 Air Flow and Combustion 1. direct air inlet 5. direct air 2. primary/secondary air inlet 6. heated ambient air/convection air 3. primary air

Page 5

13 Permitted Fuels Only natural, air-dried firewood may be burned. Under no circumstances should rubbish, other fuels, and treated or damp wood be b

Page 6 - Outside Air Supply

14 Initial Use For shipping protection the upper and lower baffle plates are wrapped in plastic. Before starting up the stove, make sure to remove t

Page 7 - Installation of Your Stove

15 Heating Up Fire lighting: Do not insert too much newspaper or kindling for lighting the fire. These materials generate a high temperature, which

Page 8

16 Operation When refilling for the first time after lighting, the primary air supply should remain opened fully. Never add more than 2-4 pounds (1

Page 9 - Connection to the Chimney

17 Important: - DO NOT use a grate or andirons to elevate the fire – build it directly on the hearth. - Once there is a good bed of embers i

Page 10

18 Attention: - The surface is hot while in operation. Keep children, clothing and furniture away. Contact with the hot surfaces may cause skin

Page 11 - Masonry

19 Cleaning Instruction Your stove (including the chimney and chimney connector) should be thoroughly checked and cleaned at least once during the c

Page 12 - Air Flow and Combustion

2 Installation and User Manual Table of Contents Introduction and Purpose 3 Technical Data 4-5 Service Packet 6 Outside Air Supply 6 Installation o

Page 13 - Permitted Fuels

20 Flue gas baffles: The lower flue gas baffle consists of 3 parts (refer to the figure at right). Push the first part (No.1) against the right comb

Page 14 - Initial Use

21 Moving parts: All moving parts (e.g. hinges and closing mechanisms) should be treated with a high temperature grease product (e.g. copper paste)

Page 15 - Heating Up

22 Maintenance of the Stove Replacing the gaskets: The gaskets must be replaced if the stove is no longer air-tight or if the gasket is damaged or i

Page 16 - Operation

23 Replacing the front glass plate window: To remove the glass plate you must remove part of the flue gas baffle and the primary air baffle. First, r

Page 17

24 Testing and Approvals The SHAKER stove is safety tested by OMNI-Test Laboratories, Inc. of Portland, Oregon and is listed to UL 1482 for the U.S.

Page 18

25 Troubleshooting Problem Cause Remedy wood catches fire very slowly or not at all - none or too little combustion air - logs are too thick - woo

Page 19 - Cleaning Instruction

3 Introduction and Purpose The purpose of this manual is to guide and instruct Shaker stove owners in proper burning to achieve environmentally fri

Page 20 - No.4 No.5

4 Technical Data SHAKER Stove: Description Data Test data: Safety approval for United States UL 1482 Safety approval for Canada ULC S627 Environme

Page 21 - Spare Parts List

5 400 575 290 265 350 525 263 635 915 400 460 505 16“ 23“ 12“ 10“ 14“ 21“ 10“ 25“ 36“ 16“ 18“ 20“

Page 22 - Maintenance of the Stove

6 Service Packet The SHAKER stove is delivered with a service packet. It contains the installation and user manual, copper lubricant, the heat prote

Page 23

7 Installation of Your Stove The distances (see Fig. on page 8) of the stove to combustible materials or walls are listed in the table below. These a

Page 24 - Warranty

8 *Note that the Parallel Wall and Corner Wall Installation clearances (diagrams I. and II.) are based on the dimensions at the top of

Page 25 - Troubleshooting

9 Connection to the Chimney The Shaker stove can be connected from top or rear. The diameter of the stove pipe is 6” (152 cm). Do not use connector

Commentaires sur ces manuels

Pas de commentaire